05 / POWER SUPPLY

Power Supply & PPA

Buy power. Structure the route.

For clients who need dependable generation without turning an energy requirement into an equipment-only transaction. Ventura can evaluate investment, engineering, deployment, generation and O&M for selected projects, with a long-term PPA defined by feasibility and contract.

Commercial frame

PPA / SUPPLY

Energy purchased. Investment assessed. Contract defined project by project.

01 / POSITION

The client buys energy

A power solution starts with the load, not the machine.

The client purchases energy. For selected projects, Ventura may assume investment and coordinate the technical route, subject to technical, financial, credit and regulatory feasibility and to an agreed contract. The commercial structure is evaluated around the client’s demand and consumption profile—not a generic equipment offer.

01

Starts with demand

02

Assesses the investment route

03

Defines responsibility by contract

Three different scopes

Equipment, service, or energy contract.

The same project can involve more than one scope, but the responsibilities are not interchangeable. Each boundary is defined before a commercial proposal is prepared.

01

Equipment

Turbines, generators, auxiliaries, electrical interfaces and related technical supply for a generation project.

Asset supply and technical interfaces — not O&M and not a PPA.

02

O&M service

Operational readiness, maintenance strategy, field execution or managed support with scope and responsibilities set by contract.

A service layer for the plant — not ownership of the energy purchase.

03

PPA

A long-term power-purchase structure in which the client buys delivered energy under project-specific commercial terms.

Conceptual fixed charge + variable component; bases, fuel allocation, metering, availability and term are agreed per project.

Conceptual PPA structure

Fixed charge plus a measured energy component.

A PPA can be structured around two commercial layers. The exact bases, allocation rules, metering method, availability treatment and term are agreed for each project after qualification.

01 / FIXED

Fixed charge

The fixed layer can reflect availability, investment recovery and the fixed scope agreed for the project.

  • Availability framework
  • Investment / fixed scope
  • Contractual base agreed per project
02 / VARIABLE

Variable component

The variable layer follows measured energy and variable costs allocated under the contract, with fuel treatment defined project by project.

  • Measured energy
  • Allocated variable costs
  • Fuel allocation as contracted

This is a conceptual commercial structure, not a tariff, quote or guaranteed financing term.

Conceptual delivery flow

From investment route to client power.

The structure below shows the commercial logic without prescribing a technology, an OEM or a financing promise. Ventura’s role is sized to the project and documented in the contract.

Conceptual structure · subject to qualificationVENTURA / POWER / CLIENT
FLOW

Ventura route

  • Investment, when applicable
  • Engineering & structuring
  • Deployment / implementation
  • O&M within agreed scope
route
FLOW

Generation

The plant converts the selected fuel and operating design into available power for the client’s defined demand.

Energy value / payment flow
FLOW

Client outcome

  • Power delivered to the client
  • PPA payment under the contract

Potential surplus

Any surplus needs its own route.

If a generation profile may exceed the client’s contracted consumption, Ventura can assess that potential surplus as a separate commercial question. It is never assumed in the base structure and remains subject to technical, financial, regulatory, interconnection and metering analysis.

01

Profile first

Compare generation shape, demand, dispatch expectations and the client’s actual consumption window.

02

Route second

Assess whether the local grid, permits, metering and applicable rules allow a separate destination for potential surplus.

03

Contract clearly

Define responsibilities, settlement logic and risk allocation before treating surplus as a commercial option.

Short qualification gate

Bring the demand profile first.

A focused briefing lets Ventura test the right route before discussing equipment, service scope or a PPA structure. Share the facts that shape feasibility; the next conversation can refine what is appropriate.

Initial demand brief

01

Demand and load profile

02

Fuel and supply context

03

Site and operating conditions

04

Grid / interconnection

05

Preferred commercial term

06

Decision and implementation context

Qualification lens

Technical fitFinancial caseCreditPermittingInterconnectionFuelMeteringAvailabilityContract tenure

An initial conversation is not a quote, a guaranteed investment commitment or a guaranteed availability promise. It is the basis for a qualified project discussion.

Next conversation

Tell us what the power must do.

We will start with demand, site, fuel, connection and commercial intent, then identify whether equipment, O&M, PPA or a combined structure is the right path.