03 / TURN-KEY

From requirement to power online

One responsibility until power is online.

Ventura structures EPC / turn-key projects from the defined power requirement, integrating engineering, equipment, supply chain, civil and electromechanical interfaces, installation, and commissioning.

Execution model

6 GATES

Definition through commissioning under one technical and commercial governance.

Execution gates

Six stages. One governance.

The scope is built by gates. This allows assuming more responsibility without hiding dependencies, exclusions, or interface risks.

01

Definition

Power, fuel, frequency, voltage, schedule, site, and operating regime.

02

Asset selection

Turbine, generator, auxiliaries, interfaces, and technical-commercial configuration.

03

Due diligence

Condition, history, documentation, title, performance, and package gaps.

04

Overhaul & readiness

Overhaul, upgrades, preservation, testing, and acceptance criteria.

05

Logistics & installation

Dismantling, transport, civil works, assembly, and electromechanical integration.

06

Power online

Commissioning, performance test, handover, and ramp-up support.

Turbine rotor assembly prepared for a new cycle

Interface control

Turn-key is not a word. It's interface control.

Commercial structures

The right responsibility for each project.

01

Equipment supply

Supply of turbine, generator, auxiliaries, and documentation with clear battery limits.

02

Refurbish + install

Overhauled asset delivered with installation, assembly, and commissioning support.

03

EPC-Light / Turn-key

Integrated coordination of engineering, supply chain, overhaul, logistics, implementation, and startup.

04

Turn-key + operations

Delivery followed by operational readiness, ramp-up, or O&M support.

Definition before promise

What is inside must be clear.

The turn-key modality is defined project by project. Battery limits, civil works, interconnection, fuel, permits, taxes, performance, availability, warranties, and local responsibilities are documented before contracting.

Responsibility matrix
List of inclusions and exclusions
Schedule and payment milestones
Acceptance and performance criteria
Change management and claims
Handover and operation plan
Structure an opportunity
CTA / VP-GLOBAL

Next decision

Have an asset to sell — or generation to put into operation?

Share the opportunity, equipment, generation requirement or service scope. Ventura will structure the right commercial and technical conversation.

Start a conversation